, ,
Project # 105 of
470
We built 24 engineered latrines throughout Ban to insulate the water supply from human waste. The units cost $250 each to install. All of the costs of the project were for materials: concrete blocks; cement; pipes; toilets; and roofing, as all of the labor for the project was contributed by local residents.