, ,
Project # 534 of
606
TGUP built a new large 42' x 21' science lab at the Bolifamba Secondary School. This add-on project equipped the new building with 9 cement workbenches (tiled surfaces) for the students to conduct experiments, and supplied 50 stools. It also piped in water and connect 3 faucets.