The old playground had only a small wooden set of swings. They were in such poor condition that they had been condemned and the swings had had to be removed.
The assembly area in front of the classrooms is too small for play equipment for the whole school, so the playground will be located in the field behind the school.
Work is going well with leveling the playground and starting to assemble the play structures.
Field is leveled Metal work begins Slide frame built Slide installed
Equipment installed at school Seesaw