The school currently has 8 classrooms for the 487 students but only 2 have cement floors and are considered ‘permanent’. This project will build a classroom measuring 28’x 28’. The cost is $21,207. Of this, $3,000 is being contributed by the community, and $2,000 has already been committed by TGUP, leaving $16,207 to be funded. This is what the current classrooms look like:
![](https://tgup.org/galleries/wp-content/uploads/2022/11/classroom-1.jpg)
There are currently 8 classrooms – all with dirt floors, holes in the walls, and roof.
![](https://tgup.org/galleries/wp-content/uploads/2022/11/Inside-classroom-1024x463.jpg)
![](https://tgup.org/galleries/wp-content/uploads/2022/11/IMG_1296-1-1024x768.jpg)
The following schematic shows the proposed new classroom:
![](https://tgup.org/galleries/wp-content/uploads/2022/11/CLASSROOMS-LAYOUTS-1024x678.png)
![](https://tgup.org/galleries/wp-content/uploads/2022/11/Screen-Shot-2022-11-19-at-11.40.44-AM-1024x580.png)